
Delivered and set in place by the people who built it.
The commission is finished when the last piece is leveled and you have signed off on it.
From the workshop floor to the sign-off.
- 01
Schedule
The delivery window is set against your opening date and the other trades on site.
- 02
Protect
Each piece is wrapped and blanketed in the workshop before it moves.
- 03
Transport
Our own crew or a freight partner, depending on distance and volume.
- 04
Set and level
Placed to the plan and leveled on the plinth levelers.
- 05
Walk-through
You check every piece against the drawing before we leave.

Based in Clearwater. Installed across the country.
Florida commissions are delivered by our own crew. Farther out, we coordinate freight and send the crew ahead of the opening.
White-glove installation
Our crew delivers, sets, levels and walks the room with you.
Shipped to your installer
Crated for freight, with the shop drawings and a placement plan for your crew.